Monday, December 31, 2012

last post off this year

Happy new year to you all


Yesterday we made a extension to the extension to put the bicycles in and did take a look at our F31 to see where we can give the floats some more volume in the nose to get a newer look like the SR. Today I cut some foam for stringers, gussets and bulkheads. Tomorrow we start do some epoxy work again.



Saturday, December 29, 2012

Strong back finished

Today we made it level and is now ready, the frames will be made in januarie.
I will start with with the small parts as stringers, bulkheads and chainplates.



Friday, December 28, 2012

Strong back made straight

Today we put the second part on and also straight out the strong back, tomorrow we make it level.



Thursday, December 27, 2012

Started with the strong back

Today we rearranged the shed some bit and I both a Bosch laser guide to line the strong back.

Bosch line laser PLL 360
The space is tight



one locker has to go

Wednesday, December 26, 2012

Finished the inside

Yesterday we finished the inside and tomorrow we go for shopping for a strong back.
Have to get some feeling with this blog because I destroyed the post here before and have publish it again.



Inside finished and light installed

Friday, December 21, 2012

New materials

Today the Corecel foam for the floats did arrived and we did some shopping for wood to extend the shed.
We use 100kg/m3 for the outside and
 80kg/m3 for the inside of the floats


Sunday, December 16, 2012

First message, we transit our progress from our site Thrill Seeker to this blog.
This weekend fared the the last beams, next week they will go to a friends workshop were they can be post-cured.



Beams between 25,6 and 26,6 kg with trampoline tubes and some extra carbon for foils.

We made the shed some longer to place the closets to the site
Next thing to do is making a extension to the shed so we can build the floats