Thursday, December 27, 2018
Making a water tank
On thing on the to do list was making a water tank. Last days I already made some panels for the tank and yesterday we glued them in place with some putty. Today I put some fillets and tape in the corners. It was a bit difficult because I made the water tank under the waste tank and had to lay half up side down to tape the corners.

Sunday, December 16, 2018
To do list
We are going to make a to do list for this winter season.
I already did some things.
I already did some things.
- Moving the thermostat from the fridge.
- Making a protection for the VHF.
- Routing the instrument cable.
- Repairing the breaking strips and bolts of the rudder bracket.
- Give the rudder some more room on the sides to make a bigger angle.
Saturday, December 8, 2018
Canting rig option setup
I put some pictures up from my canting rig option
I used some Colligo blocks for the cascade
For the top I used the CSS71-0
For the cascade I used some stacker blocks SSB-6 and SSB-9
On the chainplate I did use the CSS91-0
On the chainplate I also used a low friction ring to guide the line aft.
On the beam I used a constrictor 8 to hold the line and a Karver block on the deck near the beam.
I used some Colligo blocks for the cascade
For the top I used the CSS71-0
For the cascade I used some stacker blocks SSB-6 and SSB-9
On the chainplate I did use the CSS91-0
On the chainplate I also used a low friction ring to guide the line aft.
On the beam I used a constrictor 8 to hold the line and a Karver block on the deck near the beam.
at 15 seconds you can see the setup
Sorry for the crappy sound camera is not 100% ok
Subscribe to:
Posts (Atom)