Sunday, February 24, 2019

Installing the autopilot

Today I finished the connections for the autopilot drive and connected the logic to the power panel.
The only thing what is left is the rudder sensor, I have to look what the safest place is for the sensor.
I ripped out the wood triplex behind the power distribution because there mas mold on it, it looks more clean now. 
I took a picture of the finish fridge with the painted shelf.


Saturday, February 23, 2019

Lots of progress

We did do a lot of things but I did forget to post the pictures.
The water tank is finished and we are now busy with the auto pilot.
We paint on some spots.
We placed the guide eyes for the canting mast line more to the outside to get them more in line with the winches.
We wait with installing the solar panels till the last moment because we are doing some things on the deck and want not to harm the panels.
The little play in the rudder post under the traveler is solved.
We made an eye on the center of the pulpit to attache the line for the genaker boom.
I made some straps to tie the lines around the mast.
We are busy to make a support for the mast on the front so it can not role over.
We make some side supports for the mast installation.