Saturday, March 8, 2014

Laminate the first part of the port half

Today we started with the lamination of the first part of the port half of the main hull, it took us seven long hours of hard work from the start till when we were done. I had planned a time lapse video but when I check afterwards there were no pictures and the battery was empty. I started with a full one, so next time I check for the first pictures and shut the display. After diner we went for a look how it was going. The sail did keep it good warm, 18 grade celsius on the coldest place.




3 comments:

  1. How are you going to line up the bulkheads accurately?

    ReplyDelete
  2. I first glue the halfs togetter and then I Install the bulkheads before I lift it of the frames

    ReplyDelete
  3. This is the same methode as Rod Tharp used
    http://s177.photobucket.com/user/F32builder/library/#/user/F32builder/library/?sort=6&page=1&_suid=1400488427836004653038533124226

    ReplyDelete