Friday, September 5, 2014

Extra layer 400gr centred around frame 6

I place a extra layer 400 gr/m2 around frame 6, this is the place where the front beam bulkhead will come.
This was a small job so after that I did cut the foam what was sticking above the frame. The rest of the top floor what I had to do is gone now to. The other half has now room to be placed on the other. As a last job I did place some extra carbon on the after edge and the front.




No comments:

Post a Comment