Friday, May 8, 2015
glued the anchor locker floor in place
I made the anchor locker floor of the off cut from the beam bulkhead. I am glad that I have a half front bulkhead, it is now so much easier place the floor. Tomorrow I make some flanges on it so I can glue the other half of the front bulkhead. I did cut the front tubes, I have to put some extra carbon around them because the wall thickness need to be a little more. As that is done I can glue the other tubes in to. I also cut the carbon chain plate.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment