I started with some sanding and cutting carbon for the arms. After laminating the arms I grinned the the back were I put some putty. In the afternoon I put a carbon filter for the toilet in place and mounted the compressor for the fridge with some bolts, this took some time because of the cramped space. As last job I cut a space for the bow pole, this pole can be rotated and is detachable. In the same hole there is coming a plate were the pulpit will be mounted on.
No comments:
Post a Comment