We started with turning the floats upright. I then put the spacing for the trampoline holes on a tape what I put on the tubes. I had still a piece of paper with the measurements were the HD foam was located. I put some paper tape on the spots so I could draw were the hardware had to come. I then started with drilling some holes for the U bolts. After lunch Fetske did help me, she started with sanding the beams while I was still drilling some holes for some pad-eyes and make a tool for the router to make some holes in the tubes. Fetske did help assist me to hold the tool in place while I routed the holes. We also did a trial fit of the aft beam.
No comments:
Post a Comment