In the afternoon I worked on the other clutch to position it and drill the holes, after the tea break Fetske helped me with bolting them to the deck.
Friday, February 2, 2018
Picked-up the trampoline nets
In the morning we picked-up nets that were special made at Van Beelen. I did use some tyraps to get the nets in the right position. I did use a strait stitch but this pulls the trampoline together and make it smaller, so that is no good idea. Later I used a diagonal stitch and that works better, tomorrow we do the other lines the same way. The lines are not completely tension-ed, I will first have all the lines in place.
In the afternoon I worked on the other clutch to position it and drill the holes, after the tea break Fetske helped me with bolting them to the deck.
In the afternoon I worked on the other clutch to position it and drill the holes, after the tea break Fetske helped me with bolting them to the deck.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment