Today we glued the bottom to the anchorwell but first we had to make it fit and rounded the edges.
I also drilled a hole in the bulkhead to fit a PVC pipe to drain the lower point of the anchorwell.
After the bottom was done we started with a shelf in the front locker and a shelf for the kitchen locker.
They are made from thin triplex and get a thin layer laminate.
No comments:
Post a Comment