Sunday, January 23, 2022

How the anchorwell wil look with the Spade A80

 Today I trimmed the drainhole in the anchorwell (no picture) and cut some carbon but we did not have enough epoxy to laminate that so stopt with the ankerwell.
We then spend te rest of the time with triplex shelf for the kitchen locker. The triplex is now in the right shape and only has to get a light laminate what we do at home.

I made a picture of the anchor in the new space, you can see also the cut dry carbon.



No comments:

Post a Comment