Wednesday, July 16, 2014

frames and the bottom battens done of the next main half

I started on my one with setting up the frames. The first frame was six, I could fix this on the beam above so the rest could be fixed stable with a top batten. They will be very stable that way and perfect vertical.
during the morning my dad phone me if he could help. An hour later we were on top speed and before the lunch all the frames were up and fixed. After the lunch we screwed all the battens in place. I can now place some foam tomorrow, this time I shall not forget the HD foam strip on the bottom.





No comments:

Post a Comment