Sunday, June 25, 2017

cleaning out the inside

The last days I spend on the electric and some other small thing I wanted to do before we get the boat ready to get out of the shed. The lights all work now, some cable ducts have to be closed but that can be done if the battery loader is connected to so that the cables can be tucked away. I made a picture of the amperes with all the lights on. The gas throttle is now connected to the cables and finished. Coming week we try to make the boat ready to get it out, it has to be put on its side because the door is to narrow and it has to go diagonal. I have to make some struts to transport it out of the shed.


No comments:

Post a Comment