Sunday, June 14, 2015

various gluing and filling jobs

I started today to level the traveler bar, after that I drilled holes to fill them with HD putty for the mounting bolts for the traveler rail. The back trampoline tube did get some putty to. In the afternoon I cut some foam triangle strips to make nice corners and gluing strips. I then glued all the strip and I also filled the bow tube ends with putty and foam. With the last bit of putty I filled some low spots in the drilled holes.

No comments:

Post a Comment