Saturday, September 23, 2017

Last laminates on the port side beams connections

Yesterday we taped the inside of the port side float beam connections and started with cleaning out the other shed because the rent stops the end off the month.
Today we started with bringing some old wood from molds and barrels from the epoxy to the dump. We then laminated the deck side of the float beam connections and put some filler on the starboard side. As last job we took some stuff out of the other shed.