Friday, December 1, 2017

Some small jobs

This morning my sail maker and I went to the rigger to measure the curve of the mast so that he can design the sail it in the right curve. In the afternoon I mounted the swim ladder on the back (forgot to take a picture), I mounted the retaining plates to the beams and to the main hull. On the plate on the hull there must be drilled some holes and if that is done they can be anodized. After the tea brake Fetske painted the cabin floor for the second time and I fitted some hose tulle's in the floats. They will be use to put the cables for the transducer and the solar panel thru and it also is for venting the floats.

No comments:

Post a Comment