In the afternoon I started with making some foam panels for both hatches. Further I looked were the sink and the stove had to come. I did not laminated because it was to cold, this weekend the temperature is going up again. This weekend is relative short for me because we have some social things tomorrow afternoon and I have to work on Sunday.
Friday, January 22, 2016
did shop for some boat parts
In the morning we went to George Kniest marine shop to pick-up some parts like a Goiot escape hatch, a sink, a Origo 200A stove and a Henderson Inspection hatch for the holding tank.
In the afternoon I started with making some foam panels for both hatches. Further I looked were the sink and the stove had to come. I did not laminated because it was to cold, this weekend the temperature is going up again. This weekend is relative short for me because we have some social things tomorrow afternoon and I have to work on Sunday.
In the afternoon I started with making some foam panels for both hatches. Further I looked were the sink and the stove had to come. I did not laminated because it was to cold, this weekend the temperature is going up again. This weekend is relative short for me because we have some social things tomorrow afternoon and I have to work on Sunday.
Sunday, January 17, 2016
a little circus act
On the end we did some DD paint on the inside of the sliding hatch so this can be tape in place next time. This all with a pair extra appreciated hands of Fetske.
Saturday, January 16, 2016
started with the holdingtank
My friend Rob did come assist me today with decision making. We started with the holding tank and it was very handy to have some extra hands. I glued the bottom in place while Rob did keep some distance because he is allergic of epoxy. After that was fixed my friend Reijer gave us a visit, with the three of use we decided were the breaker panel had to come. I now can also order that one.
In the afternoon we started with the floor to make some ribs.While Rob was doing some ribs I started with the top of the sliding hatch to fit some draining holes. Before we did leave I glued the ribs and draining tubes in place.

Friday, January 15, 2016
started with the raised floor
In the morning the sleeping mattress for the front did arrive, maybe we trial fit it this weekend. The first job was to fill the small corner of the locker because the panel was a little short. In the afternoon I started with the edge to put the floor on. and taped the last panel on the outside of the locker.


Sunday, January 10, 2016
laminated the after trampoline lasing tubes
In the morning I prepared the after trampoline lasing tubes and the locker panels. After lunch Fetske did came to assist with laminating the tubes. After that and a tea break Fetske did cut some carbon for the locker and I cut the corner panel to fit. For the last part I didn't need assistance so Fetske did leave.

Update after unpacking
Saturday, January 9, 2016
laminated yesterdays panels in place
Friday, January 8, 2016
back in business
This is the first job for this year after a week with flu. I made some more panels, one for the locker in the front and on for the bottom of the kitchen locker. In the afternoon we laminated them so that I can glue them in place tomorrow. After laminating I drilled the holes for the dagger board control line blocks. I also did some work on the holding tank and I now know how to put it together still no pictures maybe tomorrow.
Subscribe to:
Posts (Atom)