Friday, January 15, 2016

started with the raised floor

In the morning the sleeping mattress for the front did arrive, maybe we trial fit it this weekend. The first job was to fill the small corner of the locker because the panel was a little short. In the afternoon I started with the edge to put the floor on. and taped the last panel on the outside of the locker.





No comments:

Post a Comment