Sunday, February 28, 2016

started with the raised floor for the toilet room

I started with the washboard to make it fit. It stays in one piece till it is laminated, it will be cut in three eagle parts later. When that was finished I started to make foam edges for the raised floor in the toilet room and glue them with PU glue to the sides. In the afternoon we laminated the edges over with some carbon. The next job was the top panel of the kitchen locker, we laminated this front and back. I finally sanded with a small longboard the toilet bowl almost round, it have to put some putty on it to get some imperfections away but that is for the next time.