Monday, November 13, 2017

laminated the swim ladder supports

I started with sanding of the supports and routed the edges round. Then I sanded the interior step and gave it a layer filler. As last job for the morning I started with the lines for the water ballast tank. I could only make two line because I did ran out of line, but they work ok. In the afternoon I took the epoxy and some carbon to the shed to laminated the the swim ladder support. I then locust on the genaker pole, I made the pole I had a little shorted because in that piece I cut away were some cracks.
It is still 240 cm and long enough. The coming days I  am on the stand of Colligo Marine on the METS so not so much building.

No comments:

Post a Comment